Chapter 3: Buildings

Each D.A. is responsible for examining applications for building permits in areas for which the competent authority. The D.A. acting as the competent authority within the limits of the province outside the areas located within the administrative limits of the Municipalities and Community Councils which have been designated as competent authority (eg, San Tychon, Limassol). For areas of the British bases, it is necessary consent As for the building permit.

3.1. Building permits

A prerequisite for a building permit is in principle secure planning permission. But there are cases where neither secure planning permission.

3.1.1. Developments that are not required to ensure planning permission:

(A) Residential to four residence in the listed property, which be located in residential area.

(B) livestock farms within a zone, except for deployments which relate pig.

(C) Industrial units within governmental districts.

(D) Several small developments are determined by the Town and Country Planning General Development Order 2003. As such, defined as follows:

* Extension to the approved dwelling house with two apartments on the condition that the cubic capacity of the extension does not increase beyond 70 cm or 25% of the approved building for whichever is greater.
* Separation of approved house with two apartments which was built at an approved site.
* Construction of a fence.
* Construction of an agricultural or forest land irrigation tanks, retaining walls, building up to 25 m, which is necessary for the breeding or keeping domestic animals.
* Erection of glasshouses on agricultural land and / or farm stores with volume not exceeding 300 cm
* Extension, improvement or alteration of industrial building provided that the Cubic Capacity of the original building is not increased beyond 25% or 1850 cubic meters, with the lesser of 2 as a valid and measurable.
* Several small deployments.

(E) In areas lying within the SBA does not apply the Town and Country Planning Act.

(F) In the areas of Community Boards as indicated in the table below is not required to issue planning permission for certain types of developments provided that the proposed development within water supply.

The above-mentioned types of development are:

(I) Residential development up to four-residence.
(II) Commercial development of the total area up to 200 m
(III) Separation of land plots for the area, rather than four
(IV) Industry limited degree of annoyance, rather than an area of 100 sq.m.

I. Nicosia

1. St. Irene
2. St. Marina of Xyliatos
3. St. Georgios of Kafkallos
4. St. Giannis of Malounta
5. St. Giannis (Selemani)
6. St. Theodoros of Solea
7. St. Theodoros of Tylliria
8. Agrokipia
9. Vyzakia
10. Denia
11. K. Moni
12. K. Koutrafas
13. Kampi Farmakas
14. Kannavia
15. Kotsiatis
16. Mathiatis
17. Marki
18. Mitsero
19. Mosfiloti
20. Nikitari
21. Xyliatos
22. Orounta
23. Pigaineia (non-coastal, tourist area)
24. Potamia
25. Potami
26. Sarandi
27. Sia

II. Limassol

1. St. Demetrios
2. St. Theodoros
3. St. Therapon
4. St. Thomas
5. St. Giannis
6. St. Pavlos
7. Agridia
8. Akapnou
9. Alektora
10. Arakapas
11. Apsiou
12. Vasa Kellakiou
13. Vikla
14. Gerovasa - Trozena
15. Dierona
16. Dymes
17. Eptagonia
18. Kaminaria
19. Kapileio
20. K. Milos
21. Klonari
22. Kissousa
23. Lemythou
24. Mathikoloni
25. Mallia
26. Palaiomylos
27. Potamitissa
28. Potamiou
29. Plataniskia
30. Prastio Kellakiou
31. Sanida
32. Sykopetra
33. Sotira
34. Tris Elies

III. Larnaca

1. Avdellero
2. Anglisides
3. Alethriko
4. Anafotia
5. Vavla
6. Delikipos
7. Kalo Chorio
8. Kelia
9. Kivisili
10. Klavdia
11. Kosi
12. Laya
13. Mari
14. Melini
15. Menoya
16. Odou
17. Ora
18. Tersefanou
19. Troulli

IV. Paphos

1. St. Georgios of Kelokedara
2. St. Giannis
3. St. Isidoros
4. Axylou
5. Vretsia
6. Galataria
7. Eledio
8. Evretou
9. Kidasi
10. Koilinia
11. Kourtakas
12. Lapithiou
13. Mamountali
14. Meladia
15. Milia
16. Mousere
17. Pelathousa
18. Pentalia
19. Simou
20. Stavrokonnou
21. Steni
22. Trachypedoula
23. Foinikas
24. Holetria

3.1.2. Application forms

I. Applications for building permits, for which planning permission

(A) Application form (ED6) completed all the necessary information and signed by the controlling owner / them.
(B) Written authorization principal for design / supervision of the project.
(C) notice of the consultant on the architectural work and the work of civil engineering.
(D) Declaration consultant (civil engineer, architect, designer of electrical installation, mechanical installation designer, designer building energy efficiency).
(E) Static calculations and drawings in duplicate.
(F) Title deeds.
(G) Electrical study.
(H) engineering study.
(I) Calculate the energy performance of buildings in duplicate .*
(I) Sewer plans in duplicate
(K) If there are commitments, a statement that the lender does not have an objection.
(L) Planning permission to duplicate plans and conditions as those issued by the Planning Authority.
(M) Supplement of architectural plans in duplicate

* No need to submit the data for the following developments:

- If the application is submitted for planning permission or Building Permit prior to 21/12/2007
- Maintenance of buildings, ancient monuments, where the application of regulations on energy efficiency will alter their character.
- Manufacturing or storage deployments for which no energy is used for regulation of their climatic conditions.
- Rural, unfit for human habitation buildings.
- Individual buildings with total floor area of less than 50 m

II. Applications for building permit for which no planning permission is required

(A) Architectural drawings in duplicate.
(B) Spatial drawings noting the proposed building
(C) Two official survey plans (the largest available scale government surveying) to indicate that the proposed building.
(D) The form (a - k) mentioned in the above paragraph, "Applications for building permits", which require planning permission.

III. Applications for marketing division for which planning permission

(A) E.D7 completed application form with all necessary information and signed by the controlling owner / them.
(B) Planning permission to duplicate plans and conditions as those issued by the Planning Authority.
(C) Written authorization principal for design / supervision of the project.
(D) notice of the student work on engineering surveyor
(E) Declaration scholar.
(F) If there are commitments, the lender's statement that it had no objection.
(G) notice of the consultant regarding the work of civil engineering where the application includes the submission of structural design and seismic studies and calculations.

IV. Applications for marketing division for which no planning permission is required

(A) forms with the exception of (b), as indicated above.
(B) the layout / cuts / s on a scale of 1:100 or 1:500 with a vertical contour interval of 2 meters, where to look:
- The proposed separation.
- The major topographical features such as multiple wells, cliffs, Argaka, electrical and / or other stakes etc.
- Other notable features of the landscape.
(C) Official survey plans in duplicate, which appear to the proposed separation.

3.2. Certificates of approval

(A) Certificate of approval for building

The licensee, no later than 21 days after completion of work in relation to which a building permit was granted under Article 3 of the Act shall notify the competent authority to complete the work and authority, if satisfied that the work under the license gives the holder of the approval certificates must work for which the permit was granted.

(B) Certificate of approval for separations

For a certificate of approval for the separation is necessary to make application to the competent authority by the owner after he implemented all the conditions accompanying the permit.

Provided that the competent authority shall not proceed with the examination of an application for a certificate of approval is pending before the certificate of completion of the project or department, which issued in the prescribed manner by the supervising engineer.

This text is the English translation of the below post. Το παρόν κείμενο αποτελεί την αγγλική μετάφραση της πιο κάτω ανάρτησης.

Δεν υπάρχουν σχόλια: